Skip to content

update

update #222

Triggered via push January 8, 2024 05:02
Status Failure
Total duration 1m 11s
Artifacts

run-tox.yml

on: push
pre-commit
25s
pre-commit
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
tests (3.8)
Process completed with exit code 1.
tests (3.11)
The job was canceled because "_3_8" failed.
tests (3.11)
The operation was canceled.
tests (3.10)
The job was canceled because "_3_8" failed.
tests (3.10)
The operation was canceled.
tests (3.9)
The job was canceled because "_3_8" failed.
tests (3.9)
The operation was canceled.