Skip to content

mutex profiling

mutex profiling #10

Triggered via push October 28, 2024 17:27
Status Failure
Total duration 36s
Artifacts

gotest.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (1.23)
Process completed with exit code 1.
build (1.21)
The job was canceled because "_1_23" failed.
build (1.21)
The operation was canceled.
build (1.22)
The job was canceled because "_1_23" failed.
build (1.22)
The operation was canceled.