Skip to content

Pull requests: tektoncd/plumbing

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Sort

Pull requests list

build(deps): bump google.golang.org/grpc from 1.69.4 to 1.70.0 in /tekton/ci/interceptors/github approved Indicates a PR has been approved by an approver from all required OWNERS files. dependencies Used by dependabot - identifies all PRs created by dependabot kind/misc Categorizes issue or PR as a miscellaneuous one. ok-to-test Indicates a non-member PR verified by an org member that is safe to test. release-note-none Denotes a PR that doesnt merit a release note. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#2416 opened Jan 27, 2025 by dependabot bot Loading…
Remove references to gcr.io/tekton* approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. kind/misc Categorizes issue or PR as a miscellaneuous one. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#2339 opened Dec 18, 2024 by afrittoli Loading…
2 tasks done
Add Results Nightly Release do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. kind/misc Categorizes issue or PR as a miscellaneuous one. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/M Denotes a PR that changes 30-99 lines, ignoring generated files.
#1972 opened May 20, 2024 by khrm Loading…
2 tasks
experiment: Add Wolfi based images do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#1735 opened Nov 24, 2023 by wlynch Draft
2 tasks
Migrate tektoncd/Pipeline integration tests from prow to tekton approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. kind/feature Categorizes issue or PR as related to a new feature. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. size/L Denotes a PR that changes 100-499 lines, ignoring generated files.
#1292 opened Nov 26, 2022 by chitrangpatel Loading…
2 tasks done
ProTip! no:milestone will show everything without a milestone.