scheduler: add batch config for evict leader scheduler #20362
pd-tests.yaml
on: pull_request
Matrix: chunks
report-coverage
0s
Annotations
10 errors
chunks (1, Unit Test(1))
Process completed with exit code 2.
|
chunks (4, Client Integration Test)
The job was canceled because "_1_Unit_Test_1_" failed.
|
chunks (6, MicroService Integration Test)
The job was canceled because "_1_Unit_Test_1_" failed.
|
chunks (6, MicroService Integration Test)
The operation was canceled.
|
chunks (3, Tools Test)
The job was canceled because "_1_Unit_Test_1_" failed.
|
chunks (3, Tools Test)
The operation was canceled.
|
chunks (2, Unit Test(2))
The job was canceled because "_1_Unit_Test_1_" failed.
|
chunks (2, Unit Test(2))
The operation was canceled.
|
chunks (5, TSO Integration Test)
The job was canceled because "_1_Unit_Test_1_" failed.
|
chunks (5, TSO Integration Test)
The operation was canceled.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
cover-reports-4
Expired
|
257 KB |
|