Skip to content

Documentation updates WIP #219

Documentation updates WIP

Documentation updates WIP #219

Triggered via push October 3, 2024 19:57
Status Failure
Total duration 4m 15s
Artifacts 3

build.yml

on: push
release
0s
release
Matrix: integration-tests
Fit to window
Zoom out
Zoom in

Annotations

7 errors
integration-tests (3.5.2)
Process completed with exit code 1.
integration-tests (3.8.2)
The job was canceled because "_3_5_2" failed.
integration-tests (3.8.2)
The operation was canceled.
integration-tests (2.15.1)
The job was canceled because "_3_5_2" failed.
integration-tests (2.15.1)
The operation was canceled.
integration-tests (3.3.2)
The job was canceled because "_3_5_2" failed.
integration-tests (3.3.2)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
host-package
958 KB
package
1.9 MB
test_failures_3.5.2
16.3 KB