Skip to content

Fix default-value for connectable. #9649

Fix default-value for connectable.

Fix default-value for connectable. #9649

Triggered via push November 25, 2024 14:05
Status Cancelled
Total duration 59s
Artifacts

ci.yml

on: push
Matrix: build
combine
0s
combine
external-and-flaky
0s
external-and-flaky
sign_windows
0s
sign_windows
sign_macos
0s
sign_macos
Update AUR package
0s
Update AUR package
Fit to window
Zoom out
Zoom in

Annotations

24 errors
build (macos-13, 5)
The run was canceled by @floitsch.
build (windows-latest, 4)
The run was canceled by @floitsch.
build (windows-latest, 1)
The run was canceled by @floitsch.
build (windows-latest, 1)
The operation was canceled.
build (windows-latest, 3)
The run was canceled by @floitsch.
build (windows-latest, 3)
Input required and not supplied: path
build (windows-latest, 3)
The operation was canceled.
build (windows-latest, 2)
The run was canceled by @floitsch.
build (windows-latest, 2)
The operation was canceled.
cross
The run was canceled by @floitsch.
build (ubuntu-20.04, 4)
The run was canceled by @floitsch.
build (windows-latest, 5)
The run was canceled by @floitsch.
build (ubuntu-20.04, 5)
The run was canceled by @floitsch.
esp32
The run was canceled by @floitsch.
build (ubuntu-20.04, 8)
The run was canceled by @floitsch.
build (macos-13, 1)
The run was canceled by @floitsch.
build (macos-13, 3)
The run was canceled by @floitsch.
build (ubuntu-20.04, 1)
The run was canceled by @floitsch.
build (ubuntu-20.04, 6)
The run was canceled by @floitsch.
build (macos-13, 4)
The run was canceled by @floitsch.
build (macos-13, 2)
The run was canceled by @floitsch.
build (ubuntu-20.04, 3)
The run was canceled by @floitsch.
build (ubuntu-20.04, 2)
The run was canceled by @floitsch.
build (ubuntu-20.04, 7)
The run was canceled by @floitsch.