Skip to content

Post-release administrivia #3

Post-release administrivia

Post-release administrivia #3

Triggered via push April 12, 2024 19:35
Status Failure
Total duration 6h 2m 55s
Artifacts

copr-builds.yml

on: push
Matrix: RPM package
Fit to window
Zoom out
Zoom in

Annotations

4 errors
RPM package (mock)
The job running on runner GitHub Actions 6 has exceeded the maximum execution time of 360 minutes.
RPM package (mock)
The operation was canceled.
RPM package (mock-core-configs)
The job was canceled because "mock" failed.
RPM package (mock-core-configs)
The operation was canceled.