Configure Renovate #10
Open
Travis CI / Travis CI - Pull Request
succeeded
Dec 15, 2023 in 2m 45s
Build Passed
The build passed, just like the previous build.
Details
This is a pull request build.
It is running a build against the merge commit, after merging #10 Configure Renovate.
Any changes that have been made to the master branch before the build ran are also included.
Jobs and Stages
This build has three jobs, running in parallel.
Job | Ruby | OS | State |
---|---|---|---|
22.1 | 2.7 | Linux | passed |
22.2 | 3.0 | Linux | passed |
22.3 | 3.1 | Linux | passed |
Build Configuration
Build Option | Setting |
---|---|
Language | Ruby |
Operating System | Linux (Xenial) |
Ruby Versions | 2.7, 3.0, 3.1 |
Build Configuration
{
"language": "ruby",
"os": [
"linux"
],
"dist": "xenial",
"sudo": false,
"rvm": [
"2.7",
"3.0",
"3.1"
],
"script": [
"bundle exec rspec"
]
}
Loading