Skip to content

woodenclock/CG1112-B03-4A

Repository files navigation

CG1112-B03-4A

These are the codes to run ALEX, a mapping and rescue robot.

Week 7 6th March, 2359 a. Design report submission. [Constitute 10% to your CA] b. Setup GitHub Private Repository with yourteam name XX‐ YY‐ZZ and add your section’s instructor as one of the members. Your section’s instructor GitHub id: Use GitHub to do versioning and collaboration with your team. We will also use it to gauge your progress. Monday(9am), Colin colintan-soc

Week 8 Studio 1 Feedback on design report. [CELC evaluation contributes 5% for participation]

Week 8 Tutorial Timeslot CELC Workshop on report writing.

Week 11 Submission of Final Report Draft, 2 April 2359 [Not graded, for CELC]

Week 12 Studio 1 (Tentative) Mock Evaluation.

Week 12 Tutorial Timeslot CELC Workshop

Week 13 Studio 2 Final Evaluation (Demo + Presentation) [Demo: 20%; Oral presentation 20%] Reading Week Saturday 17 April 2359 Final Report Due [Constitute 10% of your CA] The report template for the final report will be given by week 9, demo timeslots will be given by week 12.

About

AY20/21 CG1112 B03 Team 4A

Resources

Stars

Watchers

Forks

Releases

No releases published

Packages

No packages published

Contributors 3

  •  
  •  
  •