Skip to content

new file: .github/workflows/test.yml #1

new file: .github/workflows/test.yml

new file: .github/workflows/test.yml #1

Triggered via push October 7, 2024 21:00
Status Failure
Total duration 30s
Artifacts

test.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

6 errors
build (1.19)
package crypto/ecdh is not in GOROOT (/opt/hostedtoolcache/go/1.19.13/x64/src/crypto/ecdh)
build (1.19)
Process completed with exit code 1.
build (1.21.x)
The job was canceled because "_1_19" failed.
build (1.21.x)
The operation was canceled.
build (1.20)
The job was canceled because "_1_19" failed.
build (1.20)
The operation was canceled.