Skip to content

Add rollout upgrade integration test #122

Add rollout upgrade integration test

Add rollout upgrade integration test #122

Triggered via pull request August 6, 2024 13:10
Status Cancelled
Total duration 2h 38m 3s
Artifacts 1

e2e.yaml

on: pull_request
Build & Run E2E Images
30m 35s
Build & Run E2E Images
Matrix: Run E2E Tests
Fit to window
Zoom out
Zoom in

Annotations

13 errors
Run E2E Tests (MachineDeployment remediation)
Process completed with exit code 2.
Run E2E Tests (Workload cluster scaling)
The run was canceled by @bschimke95.
Run E2E Tests (Workload cluster scaling)
Process completed with exit code 2.
Run E2E Tests (Workload cluster scaling)
The operation was canceled.
Run E2E Tests (Workload cluster creation)
The run was canceled by @bschimke95.
Run E2E Tests (Workload cluster creation)
The operation was canceled.
Run E2E Tests (Workload cluster creation)
Process completed with exit code 2.
Run E2E Tests (Workload cluster upgrade)
The run was canceled by @bschimke95.
Run E2E Tests (Workload cluster upgrade)
Process completed with exit code 2.
Run E2E Tests (Workload cluster upgrade)
The operation was canceled.
Run E2E Tests (KCP remediation)
The run was canceled by @bschimke95.
Run E2E Tests (KCP remediation)
The operation was canceled.
Run E2E Tests (KCP remediation)
Process completed with exit code 2.

Artifacts

Produced during runtime
Name Size
e2e-images Expired
2.49 GB