Add rollout upgrade integration test #122
e2e.yaml
on: pull_request
Build & Run E2E Images
30m 35s
Matrix: Run E2E Tests
Annotations
13 errors
Run E2E Tests (MachineDeployment remediation)
Process completed with exit code 2.
|
Run E2E Tests (Workload cluster scaling)
The run was canceled by @bschimke95.
|
Run E2E Tests (Workload cluster scaling)
Process completed with exit code 2.
|
Run E2E Tests (Workload cluster scaling)
The operation was canceled.
|
Run E2E Tests (Workload cluster creation)
The run was canceled by @bschimke95.
|
Run E2E Tests (Workload cluster creation)
The operation was canceled.
|
Run E2E Tests (Workload cluster creation)
Process completed with exit code 2.
|
Run E2E Tests (Workload cluster upgrade)
The run was canceled by @bschimke95.
|
Run E2E Tests (Workload cluster upgrade)
Process completed with exit code 2.
|
Run E2E Tests (Workload cluster upgrade)
The operation was canceled.
|
Run E2E Tests (KCP remediation)
The run was canceled by @bschimke95.
|
Run E2E Tests (KCP remediation)
The operation was canceled.
|
Run E2E Tests (KCP remediation)
Process completed with exit code 2.
|
Artifacts
Produced during runtime
Name | Size | |
---|---|---|
e2e-images
Expired
|
2.49 GB |
|