Skip to content

Add rollout upgrade integration test #198

Add rollout upgrade integration test

Add rollout upgrade integration test #198

Triggered via pull request September 3, 2024 06:51
Status Cancelled
Total duration 1h 13m 16s
Artifacts 1

e2e.yaml

on: pull_request
Build & Run E2E Images
53m 45s
Build & Run E2E Images
Matrix: Run E2E Tests
Fit to window
Zoom out
Zoom in

Annotations

6 errors
Run E2E Tests (Workload cluster scaling)
The run was canceled by @bschimke95.
Run E2E Tests (Workload cluster upgrade)
The run was canceled by @bschimke95.
Run E2E Tests (Workload cluster creation)
The run was canceled by @bschimke95.
Run E2E Tests (KCP remediation)
The run was canceled by @bschimke95.
Run E2E Tests (MachineDeployment remediation)
The run was canceled by @bschimke95.
Run E2E Tests (MachineDeployment remediation)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
e2e-images
2.5 GB