Skip to content

Adapt integration tests to reuse the packed charm #92

Adapt integration tests to reuse the packed charm

Adapt integration tests to reuse the packed charm #92

Triggered via pull request August 25, 2023 10:44
Status Cancelled
Total duration 1m 20s
Artifacts

integration_test.yaml

on: pull_request
integration-tests  /  ...  /  Get runner image
integration-tests / Get runner image / Get runner image
integration-tests  /  ...  /  Get images
integration-tests / Build image / Get images
integration-tests  /  ...  /  Get rocks
integration-tests / Build rock / Get rocks
integration-tests  /  Build and push charm
0s
integration-tests / Build and push charm
Matrix: integration-tests / Build image / Build image
Waiting for pending jobs
Matrix: integration-tests / Build rock / Build rock
Waiting for pending jobs
integration-tests  /  Get rocks or Docker images
0s
integration-tests / Get rocks or Docker images
Matrix: integration-tests / Integration tests / Integration tests
Waiting for pending jobs
integration-tests  /  Required Integration Test Status Checks
0s
integration-tests / Required Integration Test Status Checks
Fit to window
Zoom out
Zoom in

Annotations

1 error
Integration tests
Canceling since a higher priority waiting request for 'operator-workflows-Integration tests-integration-tests-refs/pull/13/merge' exists