Skip to content

Build & Integration Tests: pahor/truffleMigrations #3576

Build & Integration Tests: pahor/truffleMigrations

Build & Integration Tests: pahor/truffleMigrations #3576

Triggered via pull request September 16, 2024 13:53
Status Failure
Total duration 2h 23m 36s
Artifacts

celo-monorepo.yml

on: pull_request
Install dependencies
4m 15s
Install dependencies
Protocol Test Release
2m 16s
Protocol Test Release
Matrix: certora-test
Matrix: end-to-end-geth-matrix
Matrix: protocol-test-matrix
Fit to window
Zoom out
Zoom in

Annotations

19 errors and 10 warnings
Protocol Test Release
Process completed with exit code 1.
e2e Blockchain Parameters test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-9hckl has exceeded the maximum execution time of 60 minutes.
e2e Blockchain Parameters test
The operation was canceled.
e2e Governance test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-d6mxq has exceeded the maximum execution time of 60 minutes.
e2e Governance test
The operation was canceled.
e2e Validator order test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-7drdz has exceeded the maximum execution time of 60 minutes.
e2e Validator order test
The operation was canceled.
Protocol Compatibility
The job running on runner k8s-hosted-runners-monorepo-7g9wp-g95xl has exceeded the maximum execution time of 60 minutes.
Protocol Compatibility
The operation was canceled.
e2e Replica test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-9qz7v has exceeded the maximum execution time of 60 minutes.
e2e Replica test
The operation was canceled.
e2e Sync test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-fcw26 has exceeded the maximum execution time of 60 minutes.
e2e Sync test
The operation was canceled.
Protocol Common tests
The job running on runner k8s-hosted-runners-monorepo-7g9wp-m7f86 has exceeded the maximum execution time of 60 minutes.
Protocol Common tests
The operation was canceled.
e2e Slashing test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-brbrs has exceeded the maximum execution time of 60 minutes.
e2e Slashing test
The operation was canceled.
e2e Transfer test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-8rrzf has exceeded the maximum execution time of 60 minutes.
e2e Transfer test
The operation was canceled.
Install dependencies
The following actions use a deprecated Node.js version and will be forced to run on node20: tj-actions/glob@v19. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
e2e Blockchain Parameters test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
e2e Governance test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
e2e Validator order test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
Protocol Compatibility
Attempt 1 failed. Reason: Timeout of 2400000ms hit
e2e Replica test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
e2e Sync test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
Protocol Common tests
Attempt 1 failed. Reason: Timeout of 2400000ms hit
e2e Slashing test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
e2e Transfer test
Attempt 1 failed. Reason: Timeout of 1800000ms hit