Skip to content

Build & Integration Tests: pahor/truffleMigrations #3578

Build & Integration Tests: pahor/truffleMigrations

Build & Integration Tests: pahor/truffleMigrations #3578

Triggered via pull request September 16, 2024 16:38
Status Failure
Total duration 1h 10m 40s
Artifacts

celo-monorepo.yml

on: pull_request
Install dependencies
4m 13s
Install dependencies
Protocol Test Release
2m 4s
Protocol Test Release
Matrix: certora-test
Matrix: end-to-end-geth-matrix
Matrix: protocol-test-matrix
Fit to window
Zoom out
Zoom in

Annotations

19 errors and 10 warnings
Protocol Test Release
Process completed with exit code 1.
Protocol Compatibility
The job running on runner k8s-hosted-runners-monorepo-7g9wp-d7zzm has exceeded the maximum execution time of 60 minutes.
Protocol Compatibility
The operation was canceled.
Protocol Common tests
The job running on runner k8s-hosted-runners-monorepo-7g9wp-684sn has exceeded the maximum execution time of 60 minutes.
Protocol Common tests
The operation was canceled.
e2e Governance test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-jglj9 has exceeded the maximum execution time of 60 minutes.
e2e Governance test
The operation was canceled.
e2e Blockchain Parameters test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-7vqq6 has exceeded the maximum execution time of 60 minutes.
e2e Blockchain Parameters test
The operation was canceled.
e2e Replica test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-dgmxz has exceeded the maximum execution time of 60 minutes.
e2e Replica test
The operation was canceled.
e2e Slashing test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-4ltzk has exceeded the maximum execution time of 60 minutes.
e2e Slashing test
The operation was canceled.
e2e Transfer test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-dm8zq has exceeded the maximum execution time of 60 minutes.
e2e Transfer test
The operation was canceled.
e2e Validator order test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-bg5xg has exceeded the maximum execution time of 60 minutes.
e2e Validator order test
The operation was canceled.
e2e Sync test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-r8wb6 has exceeded the maximum execution time of 60 minutes.
e2e Sync test
The operation was canceled.
Install dependencies
The following actions use a deprecated Node.js version and will be forced to run on node20: tj-actions/glob@v19. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
Protocol Compatibility
Attempt 1 failed. Reason: Timeout of 2400000ms hit
Protocol Common tests
Attempt 1 failed. Reason: Timeout of 2400000ms hit
e2e Governance test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
e2e Blockchain Parameters test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
e2e Replica test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
e2e Slashing test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
e2e Transfer test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
e2e Validator order test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
e2e Sync test
Attempt 1 failed. Reason: Timeout of 1800000ms hit