Build & Integration Tests: pahor/truffleMigrations #3582
Triggered via pull request
September 16, 2024 18:31
Status
Failure
Total duration
1h 9m 10s
Artifacts
–
celo-monorepo.yml
on: pull_request
Install dependencies
4m 27s
Protocol Test Release
2m 8s
Matrix: certora-test
Matrix: end-to-end-geth-matrix
Matrix: protocol-test-matrix
Annotations
19 errors and 10 warnings
Protocol Test Release
Process completed with exit code 1.
|
Protocol Common tests
The job running on runner k8s-hosted-runners-monorepo-7g9wp-hdmvq has exceeded the maximum execution time of 60 minutes.
|
Protocol Common tests
The operation was canceled.
|
Protocol Compatibility
The job running on runner k8s-hosted-runners-monorepo-7g9wp-ncq4d has exceeded the maximum execution time of 60 minutes.
|
Protocol Compatibility
The operation was canceled.
|
e2e Slashing test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-wpztb has exceeded the maximum execution time of 60 minutes.
|
e2e Slashing test
The operation was canceled.
|
e2e Validator order test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-5wdj6 has exceeded the maximum execution time of 60 minutes.
|
e2e Validator order test
The operation was canceled.
|
e2e Blockchain Parameters test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-whts4 has exceeded the maximum execution time of 60 minutes.
|
e2e Blockchain Parameters test
The operation was canceled.
|
e2e Governance test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-z9tbd has exceeded the maximum execution time of 60 minutes.
|
e2e Governance test
The operation was canceled.
|
e2e Sync test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-wrnjp has exceeded the maximum execution time of 60 minutes.
|
e2e Sync test
The operation was canceled.
|
e2e Replica test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-nd24g has exceeded the maximum execution time of 60 minutes.
|
e2e Replica test
The operation was canceled.
|
e2e Transfer test
The job running on runner k8s-hosted-runners-monorepo-7g9wp-x57zn has exceeded the maximum execution time of 60 minutes.
|
e2e Transfer test
The operation was canceled.
|
Install dependencies
The following actions use a deprecated Node.js version and will be forced to run on node20: tj-actions/glob@v19. For more info: https://github.blog/changelog/2024-03-07-github-actions-all-actions-will-run-on-node20-instead-of-node16-by-default/
|
Protocol Common tests
Attempt 1 failed. Reason: Timeout of 2400000ms hit
|
Protocol Compatibility
Attempt 1 failed. Reason: Timeout of 2400000ms hit
|
e2e Slashing test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|
e2e Validator order test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|
e2e Blockchain Parameters test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|
e2e Governance test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|
e2e Sync test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|
e2e Replica test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|
e2e Transfer test
Attempt 1 failed. Reason: Timeout of 1800000ms hit
|