Skip to content

Test production against changes to upstream packages #8758

Test production against changes to upstream packages

Test production against changes to upstream packages #8758

Triggered via pull request July 15, 2024 21:56
Status Failure
Total duration 7m 57s
Artifacts

ci.yaml

on: pull_request
Matrix: Emirge installation
Matrix: Examples
Matrix: Production testing
Fit to window
Zoom out
Zoom in

Annotations

11 errors
Mypy
Process completed with exit code 1.
Emirge installation (ubuntu-latest)
Process completed with exit code 1.
Emirge installation (macos-latest)
The job was canceled because "ubuntu-latest" failed.
Emirge installation (macos-latest)
The operation was canceled.
Production testing (ubuntu-latest)
Process completed with exit code 1.
Production testing (porter)
The job was canceled because "ubuntu-latest" failed.
Examples (ubuntu-latest)
Process completed with exit code 1.
Examples (porter)
The job was canceled because "ubuntu-latest" failed.
Production testing (macos-latest)
The job was canceled because "ubuntu-latest" failed.
Production testing (macos-latest)
The operation was canceled.
Pytest
Process completed with exit code 1.