-
Notifications
You must be signed in to change notification settings - Fork 5.9k
Pull requests: pingcap/tidb
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
planner: Preference index stats if they exist (WIP)
do-not-merge/needs-linked-issue
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#58689
opened Jan 5, 2025 by
terry1purcell
Loading…
1 of 13 tasks
planner: Recognize potential for correlation in subset index match (WIP)
do-not-merge/needs-linked-issue
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#58688
opened Jan 5, 2025 by
terry1purcell
Loading…
1 of 13 tasks
planner: Handle _tidb_rowid correctly in batchPointGet Plan to avoid index out of range error
do-not-merge/needs-triage-completed
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#58687
opened Jan 4, 2025 by
dash12653
Loading…
1 of 13 tasks
planner: remove useless row count in the PhysicalTableDual
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#58684
opened Jan 4, 2025 by
hawkingrei
Loading…
13 tasks
[WIP]executor,util: Stat inner/inter zone network traffic for MPP tasks
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#58683
opened Jan 3, 2025 by
yibin87
Loading…
1 of 13 tasks
ddl: supports non-unique global index
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#58678
opened Jan 3, 2025 by
Defined2014
Loading…
2 of 13 tasks
txn: skips resolving lock in auto commit optimistic statement
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#58676
opened Jan 3, 2025 by
ekexium
Loading…
1 of 13 tasks
build(deps): bump github.com/prometheus/prometheus from 0.50.1 to 0.301.0
dependencies
Pull requests that update a dependency file
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
do-not-merge/release-note-label-needed
Indicates that a PR should not merge because it's missing one of the release note labels.
go
Pull requests that update Go code
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#58672
opened Jan 3, 2025 by
dependabot
bot
Loading…
br: output backup error from TiKV
approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#58671
opened Jan 3, 2025 by
Leavrth
Loading…
2 of 13 tasks
expression: resolve bug caused by CAST during expression rewriting in compare subquery
needs-ok-to-test
Indicates a PR created by contributors and need ORG member send '/ok-to-test' to start testing.
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#58670
opened Jan 2, 2025 by
dash12653
Loading…
1 of 13 tasks
executor: fix hash join analyze statistic when spill is triggered
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#58669
opened Jan 2, 2025 by
xzhangxian1008
Loading…
1 of 13 tasks
Lightning: Allow parent directories to be created for sorted-kv-dir
approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
ok-to-test
Indicates a PR is ready to be tested.
release-note-none
Denotes a PR that doesn't merit a release note.
size/XS
Denotes a PR that changes 0-9 lines, ignoring generated files.
#58668
opened Jan 2, 2025 by
OliverS929
Loading…
1 of 13 tasks
br: better systable check in full restore
do-not-merge/needs-triage-completed
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#58662
opened Jan 2, 2025 by
RidRisR
Loading…
2 of 13 tasks
planner: fix wrong count when is out of range with datetime
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
#58661
opened Jan 2, 2025 by
hawkingrei
Loading…
1 of 13 tasks
coprocessor: fix performance regression when execute DML with lite-cop-worker meet region error
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#58659
opened Jan 2, 2025 by
crazycs520
Loading…
1 of 13 tasks
statistics: refactor stats meta handling to use DeltaUpdate for multi-table support
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#58657
opened Jan 2, 2025 by
Rustin170506
Loading…
2 of 13 tasks
*: external storage
do-not-merge/needs-linked-issue
do-not-merge/needs-tests-checked
release-note-none
Denotes a PR that doesn't merit a release note.
size/XL
Denotes a PR that changes 500-999 lines, ignoring generated files.
#58655
opened Jan 2, 2025 by
zeminzhou
Loading…
13 tasks
copr: add MppVersionV3
approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/S
Denotes a PR that changes 10-29 lines, ignoring generated files.
#58652
opened Jan 2, 2025 by
JinheLin
Loading…
1 of 13 tasks
planner: improve warning messages for unsupported HASH_JOIN hints
release-note
Denotes a PR that will be considered when it comes time to generate release notes.
sig/planner
SIG: Planner
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#58646
opened Jan 2, 2025 by
Rustin170506
Loading…
1 of 13 tasks
ttl: don't GC running TTL jobs
approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#58644
opened Jan 2, 2025 by
YangKeao
Loading…
1 of 13 tasks
*: fix insert max unsigned int64 to non-clustered table
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#58643
opened Jan 1, 2025 by
tiancaiamao
Loading…
1 of 13 tasks
importinto/lightning: fix negative value cast to upper bound in non strict sql mode
approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#58641
opened Dec 31, 2024 by
D3Hunter
Loading…
1 of 13 tasks
statistics: reduce dumpStatsMaxDuration as 5min (#56538)
do-not-merge/cherry-pick-not-approved
release-note-none
Denotes a PR that doesn't merit a release note.
sig/planner
SIG: Planner
size/XXL
Denotes a PR that changes 1000+ lines, ignoring generated files.
type/cherry-pick-for-release-6.5
This PR is cherry-picked to release-6.5 from a source PR.
#58640
opened Dec 31, 2024 by
ti-chi-bot
Loading…
1 of 13 tasks
[WIP] ddl: Remove explicit exclude for "engine" notIn "tiflash"
do-not-merge/needs-triage-completed
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
release-note-none
Denotes a PR that doesn't merit a release note.
size/M
Denotes a PR that changes 30-99 lines, ignoring generated files.
#58637
opened Dec 31, 2024 by
JaySon-Huang
Loading…
1 of 13 tasks
lightning: replace information_schema query when importing table schema with separate show create table
approved
needs-1-more-lgtm
Indicates a PR needs 1 more LGTM.
release-note-none
Denotes a PR that doesn't merit a release note.
size/L
Denotes a PR that changes 100-499 lines, ignoring generated files.
#58636
opened Dec 31, 2024 by
D3Hunter
Loading…
3 of 13 tasks
Previous Next
ProTip!
Add no:assignee to see everything that’s not assigned.