Skip to content

Merge pull request #69 from riboseinc/ribose-jeffreylau-49-compact #46

Merge pull request #69 from riboseinc/ribose-jeffreylau-49-compact

Merge pull request #69 from riboseinc/ribose-jeffreylau-49-compact #46

Triggered via push November 9, 2023 10:04
Status Failure
Total duration 35s
Artifacts
This run and associated checks have been archived and are scheduled for deletion. Learn more about checks retention

propagate.yml

on: push
test  /  rubocop_integrity
6s
test / rubocop_integrity
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

10 errors
build (lutaml/oss-guides)
The job was canceled because "interscript_oss-guides" failed.
build (glossarist/oss-guides)
The job was canceled because "interscript_oss-guides" failed.
build (ituob/oss-guides)
The job was canceled because "interscript_oss-guides" failed.
build (rnpgp/oss-guides)
The job was canceled because "interscript_oss-guides" failed.
build (metanorma/oss-guides)
The job was canceled because "interscript_oss-guides" failed.
build (plurimath/oss-guides)
The job was canceled because "interscript_oss-guides" failed.
build (relaton/oss-guides)
The job was canceled because "interscript_oss-guides" failed.
build (fontist/oss-guides)
The job was canceled because "interscript_oss-guides" failed.
build (geolexica/oss-guides)
The job was canceled because "interscript_oss-guides" failed.
build (geolexica/oss-guides)
The operation was canceled.