Skip to content

4 25 2022 Tech Team Report

qqmyers edited this page Apr 14, 2022 · 1 revision

4-25-2022

Logged Tasks

                            Date             Task Hours (Main) Hours (EOLS) Hours (PII) Hours (QDAS)
11-Apr-2022 Reporting, meeting, update Drupal upload file size limit on prod, investigate annorep fail on docx with font, add licenses to stage, coord re icons, help investigate docker AR front-end fails. 2 2
12-Apr-2022 Fix zipbomb font issue/ deploy, coord re: annorep use of roles 2
13-Apr-2022 Add Google lib update, robots.tx update, support for new counter-process to DV, deploy to dev, investigate/fixdeploy issue, coord re: Annorep role for To, start test of counter-p 0.0.4 2
14-Apr-2022 Update counter-processor/python on dev, report 2

Drupal

AnnoRep

  • Investigate/fix issue processing docx with a specific font file (ZipBomb concern since it decompresses by a larger ratio than the default allowed)
  • Helped investigate front-end failures
  • Coordinated on using roles in AR front-end and giving To the Curator role on dev
  • Deployed docx with no comments

Dataverse

  • Investigated/updated google archiving lib, added commits to update robots.txt, add counter-processor-0.1.04 support, deployed to dev

Operations

  • Updated python on dev to 3.9, reinstalled counter-processor required packages
  • configured counter-processor-0.1.04 to run on dev, updated scripts and cronjobs, ran first day manually as a test
  • Updated licenses on stage to add QDR Standard and QDR Controlled, awaiting smaller icons.

Discussion

  • Backup fix for prod? (do other machines have same mysql issue?)
  • Heads up re: Dataverse Community meeting call for talks due April 22. (FWIW - StorJ has been asked by IQSS)
  • Smaller QDR license icons?

Plans

  • AnnoRep - continue to explore/fix docx/pdf github issues
    • Deploy updates to dev/stage/prod
  • Ops
    • Deploy 5.10.1 to prod when ready
    • Convert prod datasets with custom terms to use QDR license?
  • Dataverse
    • StorJ testing
    • Popup info accessibility - IQSS likes the recommendations from the source I linked to, so this can be implemented along those lines.
    • QDAS planning/design/prototyping
      • Add error handling for format variations
      • Assess whether zip access is enough/project/other files need to be cached as aux files, etc.
    • Still want to investigate the guestbook responses re version info not being included.
  • TBD: FRDR Security
  • Other tasks as discussed in strategic planning
Clone this wiki locally